References

Stones Consult Worldwide Tunnel projects

No.

Project Name

Outline

Year (Start)

Main Contractor

TBM Type and No.

 Duration

1

 T222 Singapore

MRT Line

 201  5

 Daelim E&C

  2 x 6.6 OD EPB

32 mths

2

Sydney  Australia

MRT Line

 2014

 Thiess/JH JV

 4 x 6.5 OD Hard Rock

 30 mths

3

T208 Singapore

MRT Line 

 2015

Leighton JHoll JV

 3 x 6.6 OD Slurry

34 mths

4

 T216 Singapore

 MRT Line

 2015

 Daewoo E&C

 4 x 6.6 OD Slurry

Ongoing

5

 Kani Sib  Iran

 Water Tunnel

 2015

NFM

 1 x 6.5 OD Hard Rock

 18 mths

6

 Sabzkoh  Iran

 Water Tunnel

 2014

NFM

1 x 4 OD Hard Rock

 5 mths

7

 Donguang China

 MRT Line

 2012

NFM

1 x 6,5 OD EPB

8 mths

8

San Paolo Brazil

MRT Line

 2016

NFM Oderbrecht

1 x 12 OD EPB 1 x 12 OD Dual Mode

6 mths

9

Hong Kong

Road Tunnel

 2015

Dragages

1 x 13 OD EPB

15 mths

10

Veligonda India

Water Tunnel

2015

HCC

 

2 weeks

11

Tianjin   China

Road Tunnel

2013

NFM

1 x 10 OD Slurry

25 mths

12

Moscow Russia

MRT Line

2013

NFM

1 x 6.5 OD EPB

9 mths

13

Bandarahwela SriLanka

Water Tunnel

2012

Omran Maroon

1 x 4.5 OD Hard Rock

15 mths

14

Schwanau Germany

Water Tunnel

2012

Omran Maroon

1 x 4.5 OD Hard Rock

4 mths

15

Singapore

MRT Line

2012

SK E&C

1 x 6.2 OD Slurry

4 mths

16

Mashad     Iran

MRT Line

2011

 NFM

 1 x 9 OD EPB

 15 mths

17

Ahwas      Iran

MRT Line

2011

NFM

1 x 6.4 OD EPB

5 mths